Jeddah · Makkah and their districts

CR 4030567981 · Published prices · 15-year pool warranty

العربية 0560695695
مؤسسة بروج التألق 0560695695

Makkah · Al-Sharaie

Roof waterproofing and insulation in Al-Sharaie, Makkah

One of Makkah's largest and fastest-growing districts, in the north-east of the city, with modern residential plans and new villas. Roof waterproofing in Al-Sharaie starts with checking the falls and drainage points, because some new buildings are handed over with too little slope.

Quick answers

What is the price per m² for roofs in Al-Sharaie?
Roughly SAR 25–70 per square metre depending on the system: bitumen, membrane rolls, foam or specialist coatings.
Waterproofing or thermal insulation for my roof in Al-Sharaie?
Waterproofing stops leaks; thermal insulation reduces heat. Over air-conditioned rooms we suggest both, decided after the site visit.

Information last updated:

What suits Al-Sharaie

  • Joints and bases: Tank and AC bases and joints between roof levels are the commonest leak points, so we treat them first.
  • Summer heat: Waterproofing stops leaks and thermal insulation cuts heat; over air-conditioned rooms we suggest both.
  • New builds: The best time is before finishing, so nothing needs breaking open later.

Price

Roughly SAR 25–70 per square metre depending on the system: bitumen, membrane rolls, foam or specialist coatings.

How the work runs

  1. Inspect the roof and the old waterproofing
  2. Choose the system: waterproofing, thermal, foam or rolls
  3. Clean, repair cracks and correct falls
  4. Treat bases, joints and drains
  5. Apply the waterproofing layers
  6. Flood test and handover

Frequently asked questions

What is the price per m² for roofs in Al-Sharaie?

Roughly SAR 25–70 per square metre depending on the system: bitumen, membrane rolls, foam or specialist coatings.

Waterproofing or thermal insulation for my roof in Al-Sharaie?

Waterproofing stops leaks; thermal insulation reduces heat. Over air-conditioned rooms we suggest both, decided after the site visit.

How do you prove the roof is watertight?

We flood the roof after waterproofing and check the ceilings below before handover.

Call now0560695695 Send photos of your siteWhatsApp · written quote