Jeddah · Makkah and their districts

CR 4030567981 · Published prices · 15-year pool warranty

العربية 0560695695
مؤسسة بروج التألق 0560695695

Jeddah · Al-Naeem

Swimming pool construction in Al-Naeem, Jeddah

An established villa district in north Jeddah under the Obhur sub-municipality; many of its houses were built years ago and are now being renovated. In Al-Naeem we receive more renovation requests than new builds - new tiles, a new filter and pump, or an old leak in the suction lines.

Quick answers

What does a 4×8 m pool cost in Al-Naeem?
A 4 × 8 m pool costs SAR 75,000 with a skimmer system or SAR 87,000 with overflow, excluding excavation.
How long does a pool take in Al-Naeem?
A concrete skimmer pool usually takes 4 to 8 weeks; overflow and infinity pools take 8 to 12 weeks.

Information last updated:

What suits Al-Naeem

  • Soil: We check the ground before digging, as some Jeddah sites need water pumped out during the work.

Pool prices 2026

Size (length × width)Water surfaceSkimmer (SAR)Overflow (SAR)
3 × 4 m12 m²45,00057,000
3 × 5 m15 m²50,00062,000
4 × 6 m24 m²65,00077,000
4 × 7 m28 m²70,00082,000
4 × 8 m32 m²75,00087,000
5 × 10 m50 m²85,00097,000

Prices exclude excavation and are the same in Al-Naeem as across Jeddah. Overflow adds SAR 12,000 to each size.

Suggested pool size in Al-Naeem

Villa courtyards here usually allow a family pool with a shallow area for children.

  • 4 × 7 m: SAR 70,000 skimmer, or SAR 82,000 overflow.
  • 4 × 8 m: SAR 75,000 skimmer, or SAR 87,000 overflow.

Prices exclude excavation; we fix the final size with you after the site visit.

What the price includes

The price covers our contract specification: 10 cm blinding, 14 mm steel in two layers, 7-bag sulphate-resistant concrete, three membrane layers, three cementitious coats, a 48-hour water test, Spanish mosaic and natural stone, a Hayward pump and filter and four LED lights. Full specification on our Jeddah pool page

Frequently asked questions

What does a 4×8 m pool cost in Al-Naeem?

A 4 × 8 m pool costs SAR 75,000 with a skimmer system or SAR 87,000 with overflow, excluding excavation.

How long does a pool take in Al-Naeem?

A concrete skimmer pool usually takes 4 to 8 weeks; overflow and infinity pools take 8 to 12 weeks.

What warranty do you give?

15 years from the contract date on structure and waterproofing, and 2 years on pumps, filters, pipes and lights.

Is excavation included?

No, prices exclude excavation, which we price after seeing the site and the ground.

Call now0560695695 Send photos of your siteWhatsApp · written quote